13.10.2026

Heating large warehouses and production halls

The hall is 10 metres high, but people only work in the bottom two.
That's the core challenge of heating large warehouses and production halls.
Warm air collects under the roof, while cold air flows in at floor level through open dock doors, straight into the goods-in and dispatch area. Adding more kilowatts won't change much here. What you need is to keep the heat where it's actually needed.
In logistics and production halls, we do this with three units.
- MIX destratifiers push warm air from under the roof back down.
- GUARD PRO air curtains seal the doorway with an air stream reaching up to 9 m, and with a door limit switch they only run while the door is open.
- HEATER CONDENS unit heaters quickly warm the hall after a night or weekend shutdown, directing heat down into the zone where people work.
All of them are controlled from a single app, with optional BMS integration.
Need help choosing heating for a large hall? Get in touch:

 export@sonniger.com

 +48 530 010 740

 

Back
05.03.2026
Let's meet at the trade fair!
MCE Milano 2026
03.03.2026
Design with SONNIGER
and get the advantage!
24.02.2026
HEATER CONDENS
Models tailored to every facility!
03.02.2026
Get the advantage this winter!
with SONNIGER!
27.01.2026
Sonniger supports LZS Dragon Bojano!
Three youth teams through to the finals!
21.01.2026
How to modernize a heating system effectively?
HEATER CONDENS water unit heaters
PL|EN|FR|SE|DE|UA|LV|GR|NL|BY|KZ|CZ|SK|HU|IT|TR|
Facebook - fixYouTube - fix