13.10.2026

Heating large warehouses and production halls

The hall is 10 metres high, but people only work in the bottom two.
That's the core challenge of heating large warehouses and production halls.
Warm air collects under the roof, while cold air flows in at floor level through open dock doors, straight into the goods-in and dispatch area. Adding more kilowatts won't change much here. What you need is to keep the heat where it's actually needed.
In logistics and production halls, we do this with three units.
- MIX destratifiers push warm air from under the roof back down.
- GUARD PRO air curtains seal the doorway with an air stream reaching up to 9 m, and with a door limit switch they only run while the door is open.
- HEATER CONDENS unit heaters quickly warm the hall after a night or weekend shutdown, directing heat down into the zone where people work.
All of them are controlled from a single app, with optional BMS integration.
Need help choosing heating for a large hall? Get in touch:

 export@sonniger.com

 +48 530 010 740

 

Back
30.06.2026
Get the Advantage
Partnering with Sonniger is simply a solid foundation for your business.
29.06.2026
GUARD ONE
in your office or store
21.06.2026
High Performance. Timeless Design.
Designed with a modern, minimalist aesthetic
16.06.2026
Sonniger air conditioning
Among the most popular choices on the market
14.06.2026
Another successful installation
Natural park in Scotland
10.06.2026
Smart Controller for Heaters
Take Full Control of Your Heating System
PL|EN|FR|SE|DE|UA|LV|GR|NL|BY|KZ|CZ|SK|HU|IT|TR|
Facebook - fixYouTube - fix