13.10.2026

Heating large warehouses and production halls

The hall is 10 metres high, but people only work in the bottom two.
That's the core challenge of heating large warehouses and production halls.
Warm air collects under the roof, while cold air flows in at floor level through open dock doors, straight into the goods-in and dispatch area. Adding more kilowatts won't change much here. What you need is to keep the heat where it's actually needed.
In logistics and production halls, we do this with three units.
- MIX destratifiers push warm air from under the roof back down.
- GUARD PRO air curtains seal the doorway with an air stream reaching up to 9 m, and with a door limit switch they only run while the door is open.
- HEATER CONDENS unit heaters quickly warm the hall after a night or weekend shutdown, directing heat down into the zone where people work.
All of them are controlled from a single app, with optional BMS integration.
Need help choosing heating for a large hall? Get in touch:

 export@sonniger.com

 +48 530 010 740

 

Back
01.12.2025
Products available within 24 hours
Quick international shipping
27.11.2025
SONNIGER mixing chambers
Choose a solution that combines thermal comfort, fresh air supply and energy savings in a single setup.
25.11.2025
New! - Air curtains in the selection application
Easy selection of GUARD air curtains
19.11.2025
GUARD PRO air curtains and APEN gas heaters
Available straight from the warehouse, within 24 hours!
13.11.2025
HEATER CONDENS EC
Energy efficiency, comfort, and smart control
10.11.2025
GUARD ONE Plug&Play
At the best price, available immediately!
PL|EN|FR|SE|DE|UA|LV|GR|NL|BY|KZ|CZ|SK|HU|IT|TR|
Facebook - fixYouTube - fix