23.09.2026

The EPBD is coming into force

Starting in 2027, the era of designing HVAC installations as "isolated islands" comes to an end.

Systems can no longer operate in the background without oversight. New regulations require continuous energy tracking, performance drop detection, and real-time anomaly reporting.

Every design must now include metering (heat, cooling, and electricity meters) along with communication protocols capable of transmitting this data directly to the building manager.

Advanced controls will become mandatory for systems over 290 kW, and by the end of 2029, this threshold will drop to just 70 kW. The days of equipment that simply "heats or blows" in total disconnection from the rest of the building are gone for good.

 

At SONNIGER, we have been engineering our units with these standards in mind for a long time—which is why our control systems are 100% compliant with the new legal requirements today.

BMS Integration – seamless data transfer, operational status reporting, and full interoperability with master building systems.
 Automated Schedules – optimized electricity and heat consumption tailored to the actual occupancy and operation of the facility.
 Real-Time Parameter Monitoring – continuous monitoring of temperatures and system performance, essential for maintaining high energy ratings and hassle-free periodic inspections.
 Remote Monitoring & WiFi Control (Tuya Smart / iOS & Android) – convenient adjustments and diagnostics from anywhere, without calling on-site maintenance for routine changes.

Have questions about selecting controls or automation for your specific project? Get in touch with our technical support team:

 projekty@sonniger.com

 +48 530 031 001

 

Back
11.08.2026
Heater Condens
Work seamlessly with heat pumps.
06.08.2026
Our new project
SONNIGER is the number one choice for restaurants.
04.08.2026
HVAC equipment that gives you an edge in every project
Design, performance, and energy efficiency in one
28.07.2026
Designer Program
Become our partner
27.07.2026
Our new project
Gdynia Chooses GUARD Air Curtains!
21.07.2026
Fast device selection and ready documentation
Save time on every project
PL|EN|FR|SE|DE|UA|LV|GR|NL|BY|KZ|CZ|SK|HU|IT|TR|