13.10.2026

Heating large warehouses and production halls

The hall is 10 metres high, but people only work in the bottom two.
That's the core challenge of heating large warehouses and production halls.
Warm air collects under the roof, while cold air flows in at floor level through open dock doors, straight into the goods-in and dispatch area. Adding more kilowatts won't change much here. What you need is to keep the heat where it's actually needed.
In logistics and production halls, we do this with three units.
- MIX destratifiers push warm air from under the roof back down.
- GUARD PRO air curtains seal the doorway with an air stream reaching up to 9 m, and with a door limit switch they only run while the door is open.
- HEATER CONDENS unit heaters quickly warm the hall after a night or weekend shutdown, directing heat down into the zone where people work.
All of them are controlled from a single app, with optional BMS integration.
Need help choosing heating for a large hall? Get in touch:

 export@sonniger.com

 +48 530 010 740

 

Back
02.11.2023
DWG files of all SONNIGER devices.
Today we have another portion of information for you as part of our #SonnigerForDesigners series.
31.10.2023
Winter is coming
but in SONNIGER we have the solution!
24.10.2023
Benefits of using GUARD air curtain.
Our latest animation perfectly illustrates how our product works!
10.10.2023
HEATER CONDENS
– new trends in the water heater segment!
05.10.2023
Have you already heard about our SONNIGER selection app?
With the app, you can quickly and easily find the perfect solution to suit your preferences and requirements. #SonnigerForDesigners
03.10.2023
Guard ONE - air curtain with motion detector!
Our Guard ONE air curtain is a small unit that hides a huge amount of power.
PL|EN|FR|SE|DE|UA|LV|GR|NL|BY|KZ|CZ|SK|HU|IT|TR|